Bridge Maintenance in Siskiyou County
The Project:
The Bridge Maintenance in Siskiyou County Project will provide bridge rehabilitation along Interstate 5 at the following locations:
- Oak Street Undercrossing (Dunsmuir)
- North Mount Shasta Separation
- Abrams Lake Overcrossing (1)
- Abrams Lake Overcrossing (2)
- Deetz Road Undercrossing
- South Weed Undercrossing
- Route 5/97 Separation (1)
- Route 5/97 Separation (2)
- Route 5/265 Separation
- Klamath River Bridge & Separation (near Collier Safety Roadside Rest Area)
Project Includes:
Various bridge maintenance operations at 10 locations in Siskiyou County along Interstate 5.
Current Project Schedule:
There are an estimated 95 working days for this project, approximately 65 of which will require traffic control. Construction is scheduled for 2024.
Project Funding Estimates:
Total project cost (including support) is $3 million. This project is made possible by Senate Bill (SB) 1 funding.
Contacts:
Project Manager: Brandon Trent
Public Information Officer: Chris Woodward